This report covers trenching stage done at Jewel 01 Claims.
Trenching work was done from the 10th to 25th of October
2023 under the supervision of a geologist and co-workers.
These are the Laboratory results of our findings with trenching only done 3m Deep, 15 trenches dug at 200 meter lengths guided by our Geomagnetic Reports.
read NowNote: If you would like to view the un-redacted report kindly email us: baller@thealchemistsnft.com and we will gladly assist.